You don't have javascript enabled. Good luck with that.
Pencarian
PAL Jaya Olah Limbah Tinja di IPLT Pulogebang

PD PAL Jaya Processes Stool Waste Through Pulogebang IPLT

PD PAL Jaya is conducting stool waste processing at Pulogebang Waste Treatment Plant (IPLT), Cakung, East Jakarta.

Within one day, 900 cubic meters of stool waste can be processed

PD PAL Jaya President Director, Suberkti expressed, every day, 75 fleets of trucks from locals are alerted to Pulogebang IPLT.

"Within one day, 900 cubic meters of stool waste can be processed," he stated, Thursday (10/5).

PD PAL Jaya Intensifies Use of Bio PAL

He details, 300 cubic meters of stool waste are processed conventionally and 600 more cubic processed using mechanical systems.

"Based on the results of processing, there are two namely, solid and liquid. For the liquid waste that has been processed is flowed back to the river, while solid waste will be used for briquette and non-food crop fertilizer," he stated.

He added the number of Pulogebang IPLT employees is reaching 25 people, consisting of security officers, freelancers and personnel section.

"We continue to develop the results of waste processing to be economically valuable and beneficial to the people," he closed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
close